
In recent years,urban regenerationhas become one of the central themes in the debate on territorial policies. This prominence is no accident; it reflects a profound transformation in the way cities grow, change, and age.
After decades of construction expansion based on the use of new land, Italy and Europe are faced with a built environment that is showing its age. In many cities, the suburbs have stopped growing but have not stopped deteriorating.
In this article, I offer a brief analysis of the current situation.
What Is Urban RegenerationUrban regeneration is the structured process of restoring, redeveloping, and reusing existing buildings and public spaces, with the aim of restoring functional value, energy efficiency, and social cohesion to the city, primarily without using new land.
Entire neighborhoods built to address the housing crisis, as well as factories and other types of buildings constructed in past decades, now showvulnerability,inefficienciesandfunctional inadequacy. This built heritage consists primarily of structures built in the postwar period, using techniques, standards, and materials that are found todayat the end of their structural and performance life cycle.
In Italy, 70% of buildings are over forty years old; in addition, there aremore than 130 million square meters of floor spacedecommissioned or underutilized.
The process of urban regeneration, however, does not simply involve renovating a section of the city but rather rethinking its vital functions: mobility, safety, energy efficiency, the quality of public spaces, and social cohesion among residents. It is an undertaking that requires political vision, appropriate regulatory frameworks, financial resources, and planning expertise.
To be more specific, in my opinion, the proposals concerning“neighborhood cities”are timely and interesting. This approach proposes a shift away from the paradigms upon which modern urban areas have been built, steering new development toward a people-centered vision of the city that reduces density and creates networks of local, interconnected services.
Citizens must be able to enjoy their neighborhoods safely and freely, traveling short distances on foot or by non-polluting means of transportation.
In fact, thisprocessisone of regeneration—social before urban, functional before structural.
The Design Process
Existing structural, typological, and materialelements are not technical obstacles to be circumvented or concealed, but rather constitute the initial input for the project. In a regeneration project, the existing building establishes rhythms, proportions, and material relationships that the new intervention must acknowledge and interpret with a level of discipline that a project on a blank slate does not always require.
Recognizing something, however, does not mean imitating it. Thearchitectural qualityIt is measured precisely along that fine line between preservation and transformation: that is where the designer’s clarity of intent emerges—not only from a compositional and technological standpoint, but also with regard to the impact of the design on its urban context.
Every additional material, space, or function brings aresponsibility. Every volume taken away, every space denied, or every decision lacking civic-mindedness is a gamble.
For buildings subject to preservation restrictions under the Cultural Heritage Code, the requirements to preserve the building’s outline, footprint, and facades remain in effect. Demolition and reconstruction are not permitted. The project works with what is already there.
It’s the hardest job—and perhaps the most interesting one.
What the Law Says
In this context, the2020 Simplification Decreeintroduced concrete simplifications that alter the economic feasibility of many projects.
Under the new wording ofthe Consolidated Building Code, demolition and reconstruction may be classified as building renovation even if they involve changes to the building’s outline, facades, and footprint, provided that the pre-existing total volume is maintained.
The2026 Budget Lawgoes even further: urban regeneration projects may be carried out via SCIA, without a building permit. The floor area of properties covered by amnesty is fully recognized. Floor area bonuses and reductions in urbanization fees
are applicable without restrictions.
These are practical solutions that change theeconomic feasibilityof many projects. An inefficient, energy-intensive, structurally vulnerable building can be demolished and rebuilt to meet contemporary standards without requiring additional land use. This means that appropriate tools are available to those working in the sector.
Examples That Emerge from the GrassrootsItaly’s suburbs represent the most pressing challenge for urban regeneration, yet they are also places where innovative, grassroots-driven forms of regeneration have emerged.In Falchera, Turin, the Special Suburbs Project of the 1990s left a legacy that is still evident today: neighborhood committees, service centers, and workshops for young people. And it is important to note that these initiatives did not arise as a reaction to the absence of public involvement, but rather were supported by it.
InTor Bella Monaca, Rome, the process was the opposite: the absence of institutions sparked an autonomous response. Two self-managed libraries, a cultural hub, and small-scale initiatives built around the identity of the place.
Urban regeneration works wheninstitutions,private initiatives, andcivic groupsrecognize one another and collaborate. Where this synergy exists, the effects are lasting. It seems undeniable that urban expansion along “outer boundaries” is an outdated model. Our task is to analyze this obsolete heritage, understand its limitations, and take precise action to reintegrate it into the active urban fabric.
A Widely Used Operational Tool: Building Replacement
The termbuilding replacementdoes not appear in the Consolidated Building Code, yet it is one of the most widely used operational tools in contemporary urban regeneration.
According to the 2020 Simplification Decree, demolishing an existing building and rebuilding it—even with a different footprint, facade, or layout—is not considered new construction but is classified asa building renovation, with streamlined procedures and reduced fees.
A November 2025 ruling by the Council of State (No. 8542) established theprinciple of morphological neutrality: what matters is not the physical continuity between the old and the new, but compliance with volumetric limits and consistency with the surrounding context. The prohibition on increasing building volume under national law remains in effect, although it is permitted in some regions.
This is a fundamental step: it means that a building from 1960—which is structurally inadequate, energy-inefficient, and obsolete in terms of layout—can be replaced with a contemporary, efficient, and safe building without disrupting the urban fabric.
Building replacement is therefore the most direct form of urban regeneration: it operates at the scale of the individual building, does not require complex plans, and has an immediate impact on the quality of the built environment.
